Completed project · 8 November 2025
New double doors, cladding and guttering
New double doors were made and fitted, shiplap cladding was replaced after minor frame repairs, and guttering was installed to help manage rainwater.

Repair record
What the work included.
- Made-to-fit double doors
- Minor frame repairs
- Shiplap replacement
- Guttering installed
Every garden building is different. These photographs document this completed job; a new quotation is based on the condition, access, measurements and finish required for your own building.


Repair before replacement
A useful building may still have years left in it.
Our first step is to identify which sections have failed and which remain serviceable. That makes it possible to compare a targeted repair with replacement on a sensible, case-by-case basis.